Type:
Street
Status:
Completed
Project Location
The project rehabilitated approximately 1.3 miles of pavement on Panoramic Way, Prospect, Bancroft, Canyon, Mosswood, Arden, Dwight, and Panoramic Place.
WHAT'S HAPPENING
The scope also includes drainage, sidewalk, curb and gutter, driveways, curb ramps, retaining walls, signing, and striping. This project was funded by Measure M.
Images

Panoramic Hill Rehabilitation Project
Panoramic Hill Rehabilitation Project