Type:
Other Infrastructure
Status:
Construction
PROJECT LOCATION
Berkeley Marina – Docks D & E
WHAT'S HAPPENING
This is a Measure T1 Phase 2 project.
The project for the replacement of Docks D & E includes:
- Concrete Docks – The existing dilapidated wooden docks will be removed and replaced with new ADA-compliant concrete docks.
- Concrete Piles – the existing rotted timber piles will be removed and replaced with concrete piles.
- Utilities – all new utilities will be installed, including electrical, communications (telephone and cable), potable water, and fire suppression systems.
- Gangway – a new ADA-compliant gangway will be installed to connect the parking lot to the security gate for Docks D & E.
- Gate Structure – a new security gate will be installed at the entrance to Docks D and E, near the foot of the gangway.
- Concrete Wall – A concrete wall will be installed below the gangway.
- Slope Protection – Riprap slope protection will be installed in front of the new concrete wall
- Landside Improvements – ADA parking near Docks D & E will be repaved and repositioned, striping and signage will be updated, the concrete walkway in front of the docks will be replaced, and bollards will be installed.
The First Phase of Construction (in-water demolition of docks) began in late September and was completed by November 2024. Construction of new docks and landside improvements will resume in June 2025 and is anticipated to be completed by January 2026.
Images
D & E Dock Replacement Construction Photo #1
D & E Dock Replacement Construction Photo #1
New D&E Dock Layout Aerial View
New D&E Dock Layout Aerial View
D&E Dock Replacement photo with Crane
D&E Dock Replacement photo with Crane
D&E Dock Replacement Photo
D&E Dock Replacement Photo
Funding Source
Project Team
Provide state-of-the-art, well-maintained infrastructure, amenities, and facilities