WHAT'S HAPPENING
This is a Measure T1 Phase 2 project.
King Pool was last plastered 13 years ago, and the surfacing had exceeded its useful life. The improvements include new pool plaster surface, waterline and imbedded tile, suction outlet covers, pool filter media, chemical controller updates, pool shell plumbing modification, and bathroom fixture modernization. The baseline scope has been substantially completed, and the pool has re-opened for public use. A change order will complete electrical controller work at the pool in the Spring of 2023.