PROJECT LOCATION
Culvert Assessment Work: Strawberry Creek culvert from edge of UC Berkeley campus on Oxford Street to end of creek culvert near the intersection of Curtis Street and Addison Street
Phase 1 Construction: From western edge of Civic Center Park to daylighted creek section west of Sacramento Street
WHAT'S HAPPENING
The Strawberry Creek Culvert allows the creek's water to pass underground, helping prevent flooding, erosion, and structural damage by channeling water safely and efficiently. The City maintains sections of the culvert that pass under the public right-of-way.
Culvert assessment
Beginning in September 2022, the City of Berkeley began efforts to perform detailed mapping and structural assessment of the City owned and maintained sections of Strawberry Creek Culvert. Initial work included topographic survey and visual assessment of the entire stretch of culvert between UC Berkeley campus and the westernmost limit of the creek culvert near the intersection of Curtis Street and Addison Street. Detailed structural assessment including testing of existing concrete and rebar scanning was performed during the summer of 2023. The testing and assessment efforts culminated in a detailed structural assessment report which is available in the Documents section below.
Phase 1 construction
Phase 1 of construction focuses on rehabilitating sections of City-owned Strawberry Creek culvert which the structural analysis identified as having insufficient structural capacity. The proposed rehabilitation method consists of targeted structural repairs and the lining of culvert with high performance geopolymer mortar lining.
Construction Updates
Geopolymer mortar lining work underway.
Section 1 – West edge of Civic Center Park to west side of McKinley Ave:
- Contractor Staging: McKinley Ave
- Start: 9/24/2025
- Expected Completion: 10/06/2025
Section 2 – Grant St:
- Contractor Staging: Roosevelt Ave
- Start: Week of 10/06/2025
- Expected Completion: Week of 10/13/2025
Section 3 – Roosevelt Ave:
- Contractor Staging: Roosevelt Ave
- Start: Week of 10/06/2025
- Expected Completion: Week of 10/13/2025
Section 4 – McGee Ave:
- Contractor Staging: Roosevelt Ave
- Start: Week of 10/06/2025
- Expected Completion: Week of 10/13/2025
Section 5 – California Ave to Sacramento St:
- Contractor Staging: Spaulding Ave
- Start: TBD
- Expected Completion: TBD