This project will resurface approximately 1.9 miles of City streets, and consists of pavement rehabilitation and surface seal. In addition to street pavement, the project incorporates many other improvements as part of a “complete street” approach that repairs or replaces street infrastructure such as curb ramps, curbs, sidewalks, drainage inlets and pipes, gutters, street signage, and…
This project will resurface approximately 3 miles of City streets, and consists of pavement rehabilitation and reconstruction. In addition to street pavement, the project incorporates many other improvements as part of a “complete street” approach that repairs or replaces street infrastructure such as curb ramps, curbs, sidewalks, drainage inlets and pipes, gutters and striping.
This project will resurface approximately 1.8 miles of City streets, and consists of pavement rehabilitation and surface seal. In addition to street pavement, the project incorporates many other improvements as part of a “complete street” approach that repairs or replaces street infrastructure such as curb ramps, curbs, sidewalks, drainage inlets and pipes, gutters, and striping.
This project will resurface approximately 3.4 miles of City streets, and consists of pavement rehabilitation and surface seal. In addition to street pavement, the project incorporates many other improvements as part of a “complete street” approach that repairs or replaces street infrastructure such as curb ramps, curbs, sidewalks, drainage inlets and pipes, gutters, and striping.
This is a Measure T1 Phase 2 project.King Pool was last plastered 13 years ago, and the surfacing had exceeded its useful life. The improvements include new pool plaster surface, waterline and imbedded tile, suction outlet covers, pool filter media, chemical controller updates, pool shell plumbing modification, and bathroom fixture modernization. The baseline scope…
This project collected community input to inform a conceptual design for a bike park near the entrance to the Berkeley Waterfront. A preferred conceptual alternative was developed and shared with the public on, April 4, 2023. Renderings were prepared to reflect final round of community feedback, and are included in the Documents section, below. The conceptual design is intended to…
This is a Measure T1 Phase 2 project. This project is currently in the design phase. Final design, subject to Council approval of conceptual plans of Hopkins Street west of Gilman Street and review of parking study for the area…
This is a Measure T1 Phase 2 project.This project replaces deteriorated storm drain systems at the following locations: Marin, Euclid, Spruce, High Court, Grizzly Peak, Shasta, John Hinkel Park, Virginia,…
This is a Measure T1 Phase 2 project.The City of Berkeley’s Fire Station No. 2 is a 12,800 square foot, two-story fire station originally built in 1965 and retrofitted in 1998 to meet essential service…
This is a Measure T1 Phase 2 project.Fire Station 6 is located on Cedar Street and was rebuilt in 1999 to meet essential service standards. This project involves repairing and replacing the windows. The…