Project Location
The project limits include the following:
- Martin Luther King Jr. Way/Prince St. intersection
- Adeline St./Woolsey St. intersection
- Woolsey St. (Adeline to Wheeler)
- Wheeler St. (Woolsey to Prince)
- Prince St. (Wheeler to Fulton)
- Fulton St. (Prince to Dwight)
WHAT'S HAPPENING
The City of Berkeley's Woolsey-Fulton Bicycle Boulevard (WFBB) Project fills a gap in the Citywide bike network between the Southside area and the Ashby BART station, as shown in the graphic below. The project originated in the City's Bicycle Plan and is currently in the conceptual design phase.
This project is closely linked to the Shattuck-MLK Bus Stops (SMBB) Project, as they share the same funding source (see below) and construction schedule, and the extents of both projects are in relatively close proximity to each other.
Proposed improvements include:
- Class III bikeway (with Bicycle Boulevard pavement markings and signage) on Woolsey St. (Adeline to Wheeler), Wheeler St. (Woolsey to Prince), Prince St. (Wheeler to Fulton), and Fulton St. (Prince to Dwight).
- Intersection crossing improvements via Pedestrian Hybrid beacons (PHBs) or Rectangular Rapid Flashing Beacons (RRFBs) at five key intersections
- Traffic calming via and sidewalk bulbouts at the Shattuck/Russell and Shattuck/Woolsey intersections and traffic circles at the Fulton/Oregon and Wheeler/Prince intersections.
- Pedestrian and bike improvements across Martin Luther King Jr. Way (from Prince to the Ashby BART station) and Adeline St. (from Woolsey to the Ashby BART station) that include revisions to existing medians.
Project updates and a Frequently Asked Questions (FAQ) document will be posted in May 2024 after staff have reviewed all responses submitted during the public comment period and have determined next steps.
SCHEDULE
As of March 2024, the project schedule is anticipated as follows:
- September 2023 - February 2024: Conceptual design
- January 31, 2024: Public information meeting
- February 14, 2024: Deadline for public comments on conceptual design sketches
- March 2024 - December 2024: Detailed design
- Spring 2025 - early 2026: Construction
FUNDING SOURCE
The Woolsey-Fulton Bike Boulevard Project is funded in part by a $2.059 million State of California Affordable Housing and Sustainable Communities (AHSC) grant. The project comprises Sustainable Transportation Infrastructure (STI) to be implemented by the City as a condition of AHSC grant funding for private development projects at 2527 San Pablo Ave. and 2001 Ashby Ave.
Other project funding includes Alameda County Measure BB (Bike & Pedestrian) discretionary funds, as allocated by the Alameda County Transportation Commission.
Past Events
-
Woolsey-Fulton Bike Boulevard & Shattuck-MLK Bus Stops Safety Projects Community Meeting
January 31, 2024 1 Documents
-
Transportation And Infrastructure Committee Meeting
February 15, 2024 1 DocumentsDocument
-
Public Review and Comment Period: January 16-February 14, 2024
January 16, 2024 0 Documents
There are no documents associated with this event