Filter by

The City of Berkeley Public Works Department will be performing drainage improvements along the entire stretch of Wildcat Canyon Road within city limits. The project scope includes rehabilitating storm culverts, replacing drainage inlet structures, installing energy dissipation at culvert outfalls, slide repairs, and slope stabilization. Wildcat Canyon Road has a long history of landslides…

The City of Berkeley Public Works Department will perform drainage improvements at various locations throughout the city. The project scope includes the construction and rehabilitation of storm drain pipelines; replacement of existing and installation of new drainage structures; installation of new cross drains; and construction of concrete curb, gutter, sidewalk, driveway, valley gutter, and…

Woolsey Street and Eton Avenue are two-way, asphalt-paved residential streets with relatively low traffic volumes.  According to the City’s General Plan, the nearest Major Street is College Avenue, located about 400 feet west of the intersection (intersecting Woolsey), and the nearest Collector Street is Claremont Avenue, located about 700 feet to the southeast (intersecting Eton).A…

The South Cove Sailing Basin Dredging Study proposes to conduct public engagement to better define dredging goals and needs of the area, determine recommended dredge depth, prepare dredging design drawings, conduct soil sampling and analysis to support regulatory permits and Dredged Material Management Office (DMMO) coordination, and to provide an accurate cost estimate to perform the work.Soil…

This project will introduce additional landscaping improvements to beautify and activate the South Adeline area. Based on community input the project will also include a new dog park along the east side of the existing BART structure. Proposed improvements include new planting, new irrigation, a new drinking fountain, fencing, ADA accessible pathways, a dedicated dog park, and decorative boulders…

The Henry Ramsey Jr. South Berkeley Senior Center offers a variety of enrichment activities and support services designed to empower seniors in our community to learn, grow, and discover new ways to be actively engaged in living. The renovation project will…

The Claremont Quick Build Project will make near-term safety improvements along Claremont Avenue to create safer crossings and reduce speeding near John Muir Elementary and neighborhood destinations.Claremont Avenue is part of Berkeley’s Vision Zero

The intersection of Warring and Derby Streets is a high-injury corner. From 2011 until August 2025, there have been 15 reported collisions at this corner (according to data from the Berkeley Police Department’s Transparency Hub, 2011-2025). Since 2011, there has been two reported collisions involving a pedestrian with one resulting in a serious injury. The intersection is located on the…

The City of Berkeley will soon be adding 11 new Bay Wheels bike share docking stations and is gathering community feedback to determine where they should be located.These 11 new stations would add to Berkeley’s existing 37 docking stations, making it easier to bike without the worries of maintenance and theft that come with ownership.With Bay Wheels stations distributed across the City, bike…

The City of Berkeley Public Works Department will be rehabilitating the sanitary sewer system at several locations throughout the City.TimelineConstruction is expected to begin in April 2026 and will take approximately seven months to complete depending on weather or unforeseen conditions. Please note the construction in your immediate vicinity may not extend for this entire period. Standard…