This is a Measure T1 Phase 2 project.The project for the replacement of Docks D & E includes:
This is a Measure T1 Phase 1 Project.There are approximately 80 irrigation controllers throughout Berkeley that the City operates to water and maintain our parks, fields and medians. Currently, each…
This is a Measure T1 Phase 1 project.On June 27, 2017, Council approved a Citywide Restroom Needs Assessment Project for Phase 1 of the Measure T1 bond program. The project was designed to perform an…
The Woolsey-Fulton Bike Boulevard Project and Shattuck-MLK Bus Stops Project are being constructed together as the South Berkeley Bikeway and Bus Stop Improvements Project. Refer to the South Berkeley Bus Stop Improvements Project for updated construction information.Shattuck-MLK Bus Stops Project improvements include relocating bus stops to the far side of the…
The Woolsey-Fulton Bike Boulevard Project and Shattuck-MLK Bus Stops Project are being constructed together as the South Berkeley Bikeway and Bus Stop Improvements Project. Refer to the South Berkeley Bus Stop Improvements Project for updated construction…
Planning is underway to re-imagine the Ashby and North Berkeley BART stations as vibrant places that include housing, open space and community amenities. Both sites are owned by the San Francisco Bay Area Rapid Transit District (BART). In June 2025, BART selected the Adeline Alliance Partners to reimagine the Ashby West Lot. The project team is working to design and develop 3 affordable housing…
The ADA gangway float showed signs of deterioration in early 2024, and on-site repairs were made in March 2024 to add welds and additional framing. Despite those repair efforts, the gangway and float sustained irreparable damage during storm events, and the gangway was closed in late 2024.In June, 2025, the 80’ long gangway structure along with the damaged float was removed entirely to prevent…
This is a Measure T1 Phase 2 project.Proposed improvements include lighting improvements, installation of a permanent pre-fab restroom, and various site related improvements.The new permanent restroom…
The project design is completed and was scheduled to begin construction However, in 2025, the Regional Water Quality Control Board (“Water Board”) issued a regulatory compliance letter to the City of Berkeley indicating that industrial waste materials containing certain radionuclides may have been disposed at the landfill in the 1980s underneath what became Cesar Chavez Park. The letter…
This is a Measure T1 Phase 2 project.In 2025, the Regional Water Quality Control Board (“Water Board”) issued a regulatory compliance letter to the City of Berkeley indicating that industrial waste materials containing certain radionuclides may have been disposed at the landfill in the 1980s underneath what became Cesar Chavez Park. The letter required the City to initiate…