The City of Berkeley has prepared a Draft Parking Management Implementation Plan and is in the process of conducting public outreach to gather feedback on this Draft Plan. Written feedback can be submitted to the Project Manager at LMcNulty@berkeleyca.gov.
This is a Measure T1 Phase 2 project.This project will improve the citywide network of pedestrian paths. Construction is 100% complete. Path improvements have been completed at: Florida Walk, Fountain Walk…
The Outdoor Warning System will include emergency sirens at 15 locations across Berkeley. The installation of 2 more sirens in the last part of Phase II is ongoing, and some locations may change as the permitting and installation process is finalized. When sirens are added, we will update the map to reflect these new locations. Explore the current siren locations on the map below or…
A quick-build traffic safety improvements project through Vision Zero, a program, which aims to eliminate traffic fatalities and severe injuries, will be implemented for traffic calming and safety improvements at this intersection. This project will improve traffic flow, increase sight lines, and clarify right-of-way rules which reduce the occurrence and severity of traffic collisions for all…
The Cedar Rose Park Playground Renovation Project aims to renovate the children's play areas within the park and make associated site improvements. Initial conceptual designs were presented at community meetings in 2023. Based on the feedback and input we heard, we presented final concepts at a third community meeting in late 2024. Review documents presented at the meetings by clicking…
This is a Measure T1 Phase 2 project.Located next to Grove Park, the Martin Luther King Jr. Youth Services Center/Young Adult Project (Y.A.P.) houses various afterschool and summer recreation programs…
This is a Measure T1 Phase 2 project.The South Adeline Landscaping Improvements and Dog Park Project introduced landscaping improvements to beautify and activate this area of South Berkeley. The improvements are located along Adeline Street at the gateway to the City of Berkeley near the border with Oakland. Based on community input, the project included a…
This is a Measure T1 Phase 2 project.This project was completed in March, 2026.F and G docks, originally constructed in the 1990s, have served the marina community for more than two decades. Over time, the original wooden decking has become weathered, faded, and splintered.To enhance safety, appearance, and longevity, the City replaced the existing wooden decking…
The City of Berkeley Public Works Department will be performing drainage improvements along the entire stretch of Wildcat Canyon Road within city limits. The project scope includes replacing and rehabilitating storm culverts and drainage inlet structures, installing energy dissipation at culvert outfalls, erosion mitigation, minor concrete, and other related work. Wildcat Canyon Road has a…
The City of Berkeley Public Works Department will perform drainage improvements at various locations throughout the city. The project scope includes the construction and rehabilitation of storm drain pipelines; replacement of existing and installation of new drainage structures; installation of new cross drains; and construction of concrete curb, gutter, sidewalk, driveway, valley gutter, and…